Skip to main content

Table 3 Completion rates and scores for routinely collected and patient-reported outcome measures

From: Improving the safety and experience of transitions from hospital to home: a cluster randomised controlled feasibility trial of the 'Your Care Needs You' intervention versus usual care

Outcome measure

Intervention (n = 95)

Control (n = 66)

Overall (n = 161)

 

n(%)

Mean (SD)

n(%)

Mean (SD)

n(%)

Mean (SD)

Emergency readmissions

 30 days

87 (91.6%)

0.2 (0.4)

61 (92.4%)

0.2 (0.6)

148 (91.9%)

0.2 (0.5)

 60 days

87 (91.6%)

0.3 (0.6)

61 (92.4%)

0.4 (0.7)

148 (91.9%)

0.3 (0.6)

 90 days

87 (91.6%)

0.4 (0.6)

61 (92.4%)

0.5 (0.7)

148 (91.9%)

0.4 (0.7)

EQ5D-5L

 Baseline

95 (100.0%)

0.512 (0.3)

66 (100.0%)

0.441 (0.3)

161 (100.0%)

0.483 (0.3)

 5 days

68 (71.6%)

0.495 (0.3)

48 (72.7%)

0.506 (0.3)

116 (72.0%)

0.499 (0.3)

 30 days

51 (53.7%)

0.512 (0.3)

40 (60.6%)

0.484 (0.3)

91 (56.5%)

0.500 (0.3)

 90 days

11 (11.6%)

0.416 (0.4)

16 (24.2%)

0.587 (0.3)

27 (16.8%)

0.517 (0.3)

EQ5D VAS

 Baseline

95 (100.0%)

50.1 (21.1)

66 (100.0%)

56.2 (20.0)

161 (100.0%)

52.6 (20.8)

 5 days

69 (72.6%)

58.2 (18.0)

47 (71.2%)

53.7 (23.3)

116 (72.0%)

56.4 (20.3)

 30 days

53 (55.8%)

60.5 (20.6)

39 (59.1%)

60.2 (20.0)

92 (57.1%)

60.4 (20.2)

 90 days

11 (11.6%)

58.2 (20.3)

16 (24.2%)

67.8 (17.9)

27 (16.8%)

63.9 (19.1)

PACT-M

 5 days

62 (65.3%)

50.8 (9.2)

38 (57.6%)

49.5 (9.6)

100 (62.1%)

50.3 (9.3)

 30 days

45 (47.4%)

54.4 (8.3)

34 (51.6%)

53.1 (9.0)

79 (49.1%)

53.8 (8.6)

 90 days

9 (9.5%)

51.3 (8.3)

11 (16.7%)

57.5 (6.6)

20 (12.4%)

54.7 (7.9)

CTM-3

 5 days

63 (66.3%)

68.2 (18.6)

43 (65.2%)

64.0 (17.5)

106 (65.8%)

66.5 (18.2)

 30 days

45 (47.4%)

67.5 (18.5)

33 (50%)

63.1 (17.0)

78 (48.4%)

65.7 (17.9)

 90 days

11 (11.6%)

68.7 (19.8)

13 (19.7%)

63.2 (18.9)

24 (14.9%)

65.7 (19.1)

  1. NB these measures were collected at follow-up to assess the feasibility of data collection. Information on how these measures are scored is provided in Table 1