Fig. 3From: Should treatment effects be estimated in pilot and feasibility studies?Confidence intervals for the estimated treatment effect in study 18 (n = 34) in the simulated example, at varying confidence levels from 95 to 70%. The dashed horizontal reference line indicates the minimum important differenceBack to article page