Skip to main content

Table 3 Incidence rate ratios for the total number of CONSORT Pilot Trial Extension Items Reported

From: Reporting quality of pilot clinical trials in chronic kidney disease patients on hemodialysis: a methodological survey

Variable

Unadjusted incident rate ratio (95% confidence interval)

P value

Adjusted incident rate ratio (95% confidence interval)

P value

Year

1.025 (1.017, 1.032)

< 0.001

1.026 (1.018, 1.034)

< 0.001

Sample size (1 unit increase = 20 participants)

1.019 (1.004, 1.035)

0.011

1.021 (1.010, 1.031)

< 0.001

Multisite study (single center)

0.966 (0.870, 1.073)

0.520

1.030 (0.941, 1.128)

0.517

Industry funding (non-industry funding)

1.026 (0.922, 1.142)

0.639

0.976 (0.880, 1.082)

0.639

Prelude to future definitive trial (not a prelude)

1.070 (0.909, 1.260)

0.416

1.033 (0.900, 1.185)

0.645

Journal endorses CONSORT (does not endorse)

1.122 (1.001, 1.258)

0.049

0.978 (0.870, 1.099)

0.704