Fig. 6From: Evaluation of a smartwatch-based intervention providing feedback of daily activity within a research-naive stroke ward: a pilot randomised controlled trialGraphs showing different analysis metrics of activity score (AS) from participant 1033 (Pilot RCT-No Feedback Group). Graphs (a) and (b) show the difference in AS from baseline AS (BAS). Graphs (c) and (d) show the difference in AS from the previous day’s values. P1 to P4 refer to each 2-h time period between 08:00 and 16:00Back to article page